FISA Safety Bulletin - Timber Handling Risk Zones - July 2020

A recent near miss incident on a quayside highlighted the need for vigilance when handling timber in ports and logyards.

RECOMMENDATIONS
Whether in a port, forest or logyard situation, entering a designated Risk Zone (RZ) in a machine or on foot should only be conducted if:

  • A SSOW (Safe system of work) is in place and all operatives informed - this could include horn signals / radios or a proximity alarm system
  • Pedestrians entering a machine RZ must make sure the machine operator has seen them, stopped the machine and has clearly signalled them to proceed.
  • Work together !
  • Machine operators automatically stop works if they see anyone unauthorised approaching or entering the Risk Zone
  • All operatives wear minimum 3 point PPE – including appropriate Hi Viz wear
  • Machinery has Risk Zone clearly indicated – but this ‘number’ should also be discussed at all pre com and tool box talk meetings
  • Ship owners and operators should actively manage the crew and encourage safe working practices at all ports regardless of visit frequencies.
  • Port operators should actively manage the quayside to encourage a safe working environment.

Documents to download

Previous Article Tilhill Forestry - Safety Assurance Bulletin - August 2020
Next Article Passing under Overhead Power Lines
Print

Latest Bulletins

AFAG Initial Notifications - 2025

The HSE are sharing these notifications. Because the incidents are under investigation exact details will not be available and will not be provided with these notifications (either because the facts haven’t been established or release may prejudice enquiries).

April 2025 - AFAG Fatal Notification - Struck by an object (tree trunk)

Read more