News

Timber Stacking in Ports

Creel Maritime Safety Bulletin

A recent quayside event emphasised the importance of operational pre-planning when stacking timber in ports.

Timber at this port had not been block-stacked correctly as the stanchions had been placed too far apart, roundwood timber was not squared-off / butted square on a regular interval and stacks were created in rows outside the reach of the stevedores handling machine. This resulted in a health and safety issue for all port users and the crane operator when loading the vessel.

Recommendations include: plan the stacking arrangement; use caution when stacking, always block-stack with no gaps between rows; and raise any concerns while monitoring the stacks.

Print

Latest News

Healthy Trees Need Healthy People

FISA are delighted to join with other organisations from across the forestry sector to tackle the growing issues surrounding Mental Health in forestry through this new initiative.

Read more